Design/Build Brazil 2010 + 2012

Systems and Strategies in the Pantanal

Pages

  • Home
  • Document ONE

Document ONE


Open publication - Free publishing - More brazil
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Home
Subscribe to: Posts (Atom)

2012 SCOPE

PCER will add an energy independent gravity fed water supply to the school and remote internet technologies developed at the University of Michigan to prepare to expand the educational program to rural healthcare accommodations. The above design is one of two that will be constructed with the second still in design development.

Pantanal Center for Research and Education

  • PCER

Water Systems

  • Water Systems

Picassa Photo Albums

  • Photos

Blog Archive

  • ▼  2012 (41)
    • ▼  July (2)
      • Water tower with fast sand filtration almost co...
      • Solar panels being mounted to concrete structure
    • ►  June (18)
    • ►  May (19)
    • ►  April (2)
  • ►  2010 (58)
    • ►  October (21)
    • ►  September (1)
    • ►  August (18)
    • ►  July (5)
    • ►  June (12)
    • ►  May (1)

Followers

About Me

J Chesnut
View my complete profile

Components

  • Bond Beam (8)
  • Columns (14)
  • Design (5)
  • Footings (3)
  • Local Knowledge (4)
  • Roof System (8)
  • Site Work (3)
  • The Children (2)
  • Videos (1)
  • Wall Systems (5)
  • Water Systems (3)
Simple theme. Powered by Blogger.