Showing posts with label Water Systems. Show all posts
Showing posts with label Water Systems. Show all posts

Monday, October 4, 2010

Bio Sand Filter/Solar Power


The bio sand filter has been tested and works properly.  One of the solar panels mocked up and tested.  They will ultimately be situated on the roof with the angle of the roof being designed to the optimal specs for solar orientation.

Outfitting


 Plumbing supplies and other hardware arrived on site which made it a bit easier to understand the wastewater and delivery connections, dimensions, and placement of stub-outs and the larger gravity feed water systems.  Much like North American coding it is done by color where brown pipe is used in exterior conditions and white in interior.

Friday, August 6, 2010

Waste Water



The plumbing infrastructure is installed within the "water bar" of the initial design. Water delivery will come from above and waste water will terminate below ground: all of which exist within the same bay in plan, localizing the water systems. Separate piping is run for sinks/showers and toilets. Black water being 100mm and gray being 40mm.