Wednesday, June 9, 2010

Week 1-2


We paid a visit to the construction supplies store that will be providing the materials for the project. This gave us a better idea of what would be available to us and the concrete mixture typically used = 6 sand, 3 gravel, 1 cement. We should be connecting with the contractor/construction supervisor very soon to determine an exact start date. We met with the engineer to approve the final drawings and discuss the details of the structural system. Pictured are the final drawings given to us by the engineer. We will post diagrams of exactly how the roof members come together soon. “Soon” is as specific as it gets here. We returned to the Jaguar Reserve to discover the site unexcavated. We are sure it will get done soon though.

1 comment:

  1. Might not seem so, but looks like progress to me... Good luck to the team...

    ReplyDelete