Week 11. The main project of week eleven is the construction of the roof system. Also, as pictured in the top right, the floor is tamped down in preparation for a slab which is one of the last components (due in part because it is colored concrete). Also shown above (bottom right) is a scaffolding system and (bottom left) the roof monitor.