By the end of summer 2010 much of the school construction was complete and 2011 operations included perfecting the bio-sand filter and implementing an anaerobic digester. The Pantanal Center for Education will be expanding its footprint and technological endeavors this summer 2012 and I am excited to be partnered with the team and two local pedreiros (masons) for our second architectural design + build.
No comments:
Post a Comment