Friday, June 15, 2012


In one bay of the water tower there will be an enclosed closet at the ground floor.  We have installed a mix of #3 and 4.2 mm rebar as a mesh reinforcement.  I have woven it together in an attempt to create what would be considered a welded wire mesh and have attached the mesh to the bond beam cages prior to pouring the bond beam.  Here we are forming the slab to be poured.

No comments:

Post a Comment