In one bay of the water tower there will be an enclosed closet at the ground floor. We have installed a mix of #3 and 4.2 mm rebar as a mesh reinforcement. I have woven it together in an attempt to create what would be considered a welded wire mesh and have attached the mesh to the bond beam cages prior to pouring the bond beam. Here we are forming the slab to be poured.
No comments:
Post a Comment